High-Voltage Circuit Deactivation Procedure LG Batteries
High-Voltage Circuit Deactivation Procedure for BMW Batteries
Verification of Engine and Control Components
Verification of the MCU Inverter
Coolant Replacement
Coolant Level Verification
Radiator Inspection
Cooling System Hoses Collar Inspection
Verification of the Firewall Connections
Changing the axle lubricant and cleaning the magnetic cap
Verification of the Amount of Lubricant in the Front Axle
Inspection and Lubrification of the Steering Rod End Cap
Kingpin Lubrication
Tire Inspection
Verification of the Wheels Nuts
Drag Link Inspection
Hydraulic Pump Seal Inspection
Brake Lining Wear Verification
Operational Verification of the Parking Brake (hydraulic)
Brake Fluid Verification
Parking Brake Verification – Air Brake
Electric Heating Inspection
Air Conditioning Inspection
High Voltage Cables Verification
Verification of the Battery Charging System
High Voltage LG Batteries Inspection
High Voltage BMW Batteries Inspection
Functional Inspection of Emergency Exits
Seatbelts Inspection
Passenger Seats Inspection
Inspection of the Driver Seat – Pneumatic Suspension
Floor Condition Inspection
Bodywork Condition Verification
Bodywork Fastener Verification
Secondary hydraulic pump verification